Pre-installed or separate, depending on the ordered configuration. Document and Hardware Kit Anchor bolts (typically M10 or M12 expansion anchors). Alignment jigs/templates. Synchronization communication cables. System keys for side panels and top lids. 3. Step-by-Step Installation Procedure Step 1: Layout and Marking
Measure the gap between the glass leaves (or between the leaf and the receiving cabinet). The gap must be perfectly uniform from top to bottom.
Rotate the motor drive shaft manually to the fully closed position. gunnebo speedstile fl installation manual
Concrete floors must have a minimum thickness of and a strength rating of C20/25.
Following these procedures ensures the unit is secure, level, and functional. 3.1. Positioning and Alignment Synchronization communication cables
⚠️ If the glass wing has a smudge, it’s not yours. Wear gloves.
If you need help with a specific part of the setup, let me know: Inter-Cabinet Data Bus
Ensure a dedicated, high-quality ground (earth) wire is connected directly to the primary grounding stud on the chassis. Inter-Cabinet Data Bus